NICCE 2015

NAROTAMA INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING (NICCE) 2015 (5 – 8 NOVEMBER 2015)

NICCE 2015, Memacu Dosen Menulis Di Jurnal Internasional Terindex Scopus

PROCEEDINGS OF NICCE 2015 (ISBN : 978-602-72437-2-9)

COVER – NICCE 2015 PROCEEDING UNIV. NAROTAMA PRESS

Keynote Speakers

  1. The Influence of E-Procurement System to the Quality of Construction Work in Indonesia (Project Management – Koespiadi 1-12)
  2. Barriers of BIM Implementation: Experience in Thailand (Project Management – Rathavoot 13 – 14)
  3. Liveability and Sustainability Based Framework and Process Models for Engineering System Design (Project Management – Zamani 15 – 22)
  4. Effect of Polypropylene Fiber Reinforced Cement Composites on the Seismic Performance of Bridge Columns based on Full Scale and Scaled Model Experiments (Structural and Material Engineering – Zafra 23 – 30)
  5. Construction Dispute Resolution in Indonesia (Project Management – Kurniawan 31 – 40)
  6. Sustainability Evaluation of Urban Development in the Context of Transportation Planning (Transportation – Renato 41 – 48)

Transportation

  1. Flow Profile on Urban Road Intersection Based on The Longitudinal Slope (Transportation – Sedyowati 49 – 56)
  2. Study on Increasing the Capacity Management and Engineering of Junction Roundabout Plus Underpass: A Case Study on Intersection of Jl. Perintis Kemerdekaan and Sultan Hasanuddin Airport (Transportation – Basri 57 – 64)
  3. Evaluation of Resilient Modulus Performance of Warm Mix Polymer Modified Asphalt Using Natural Zeolite Additives (Transportation – Handayani 65 – 74)
  4. Important Factors in Urban Public Mass Transport Railway-Based (Transportation – Ircham 75 – 82)
  5. Parking Usage Model with Simulation Program in Surabaya City (Transportation – Mudjanarko 83 – 88)
  6. Mixture Variation of Tack Coat on Shear Stress between Existing Fexible Pavement and Hot Roller Sheet Overlay (Transportation – Udi 89 – 94)
  7. Factor Analysis of Delay Project MERR-IIC Road Construction at Surabaya Indonesia (Transportation – Oetomo 95 – 116)

Project Management

  1. Risks behind the Variables of Financial Model for Public-Private Partnership Project (Project Management – Ogunlana 117 – 124)
  2. Comparison of Work Between Bottom Up Method and Top Down Method: Execution and Timing (Project Management – Randi 125 – 138)
  3. The Development of the Central Business District (CBD) based on Public-Private Partnership (Project Management – Nasihien 139 – 144)
  4. Concession Contract in the Public Private Partnership: Case Study of Don Muang Tollway and Second Stage Expressway in Thailand (Project Management – Chotchai 145 – 152)
  5. The Comparison between Semi Conventional and Peri Scaffolding: Cost and Time Comparison at Tunjungan Plaza 6 Project in Surabaya (Project Management – Julistyana 153 – 160)
  6. Analysis on Factors Influencing Productivity of Construction Workers in Surabaya (Project Management – Diah Ayu 161 – 166)
  7. Financial Feasibility Study: The Development of Shophouse at Sun Safira Regency in Sidoarjo (Project Management – Julistyana 167 – 172)

Structural and Material Engineering

  1. CFD simulation for predicting the wind effect on the high rise building: NET Tower Surabaya (Structural and Material Engineering – Dani 173 – 182)
  2. Expert System for Structural Analysis and Design of Communication Tower Project Management – Ogunlana 117 – 124(Structural and Material Engineering – Bagio 183 – 190)
  3. The Usage of Crushed Stone Waste as an Alternative of Sand Material for Paving Block Mixture (Structural and Material Engineering – Dwi 191 – 196)
  4. Study of Failure Factors Suspension Bridge: The Case of 470 Meter Suspension Bridge Collapse (Structural and Material Engineering – Nugraha 197 – 210)
  5. Simple Building Using Laminated Plate (Structural and Material Engineering – Bagio 211 – 218)
  6. Air Inflated Greenhouse as urban farming facilities: Architectural Overview (Structural and Material Engineering – Idid 219 – 226)

Geotechnical Engineering

  1. Influence Of Bamboo Pile In The Pile Mattress Bamboo Construction Systems As Reinforcement Of Soft Subgrade That Support Embankment Load (Geotechnical – Bambang 227 – 238)
  2. Modification Model of Pile Foundation due to Additional Ground Water Tank (Geotechnical – Haryo 239 – 244)

Environmental Engineering

  1. The preference of Pinggirpapas Villagers on Waste Management in Sumenep District (Environmental Engineering – Anita 245 – 248)
  2. Green Behavior Model of Individual Differences, the Effect of Environment and Marketing Strategy to Green Purchase Behavior and Green Consumer Satisfaction of LCGC Users in Surabaya (Environmental Engineering – Gede 249 – 255)